Chery Amulet since 2006
1. Car device
2. Recommendations about operation
3. Malfunctions in a way
4. Maintenance
5. Engine
5.1. Features of a design
5.2. Possible malfunctions of the engine, their reason and ways of elimination
5.3. Compression check in cylinders
5.4. Removal and installation of protection of a case of the engine
5.5. Replacement of support of a suspension bracket of the power unit
5.6. Installation of the piston of the first cylinder in the provision VMT of a step of compression
5.7. Removal, defektovka and flywheel installation
5.8. Replacement of details of consolidation of the engine
5.9. Head of the block of cylinders
5.10. Removal and engine installation
5.11. Engine repair
5.12. Greasing system
5.13. Cooling system
5.14. Power supply system
5.15. Catching system паров fuels
5.16. Cистема of production of the fulfilled gases
5.16.1. Features of a design
5.16.2. Replacement of pillows of a suspension bracket of system of production of the fulfilled gases
5.16.3. Replacement of the main exhaust silencer
5.16.4. Replacement of the additional exhaust silencer
5.16.5. Replacement of converter of the fulfilled gases
5.16.6. Replacement of a reception pipe
5.16.7. Removal and installation of thermoscreens
6. Transmission
7. Running gear
8. Steering
9. Brake system
10. Electric equipment
11. Body
12. Appendices
13. Electric equipment schemes
 






8c4a8411




5-16-6-zamena-priemnojj-truby.html

5.16.6. Replacement of a reception pipe

It be required to you: keys «on 10», «on 13», «on 22», a face head «on 16», a screw-driver with a flat edge.
1. Holding a key «on 10» bolts, unscrew a key «on 13» two nuts of fastening of a flange of a reception pipe to a converter flange, separate flanges and remove sealing laying.
2. A face head «on 16» unscrew three nuts of fastening of a flange of a reception pipe to a final collector.

Good advice
Nuts of fastening of a flange of a reception pipe after long operation "burn" to hairpins. In order to avoid breakage of hairpins before an otvorachivaniye moisten carving connections by WD-40 liquid (or the structures similar to it) or kerosene.
We recommend to replace at each dismantling of connections nuts new as sides of nuts can be crumpled and at the subsequent inhaling (otvorachivaniya) can break absolutely then will unscrew a nut very difficult.

3. Put forward from a block of the sensor of concentration of oxygen a clamp...
4.... also separate a block.
5. Remove from an arm of a reception pipe of a pillow of a suspension bracket (operation is shown at the removed converter of the fulfilled gases).
6. Shift a flange of a reception pipe from hairpins of a final collector and remove a pipe.
7. Remove sealing laying from a flange of a final collector.

Good advice
Replace new sealing laying between flanges of a reception pipe, converter and a final collector at each dismantling of connection as strongly pressed out laying will not provide reliable consolidation.

8. A key «on 22» turn out from a reception pipe the sensor of concentration of oxygen and establish it on a new reception pipe.
9. Establish a reception pipe as it should be, the return to removal.

«previous page
5.16.5. Replacement of converter of the fulfilled gases
following page»
5.16.7. Removal and installation of thermoscreens