Chery Amulet since 2006
1. Car device
2. Recommendations about operation
3. Malfunctions in a way
4. Maintenance
5. Engine
5.1. Features of a design
5.2. Possible malfunctions of the engine, their reason and ways of elimination
5.3. Compression check in cylinders
5.4. Removal and installation of protection of a case of the engine
5.5. Replacement of support of a suspension bracket of the power unit
5.6. Installation of the piston of the first cylinder in the provision VMT of a step of compression
5.7. Removal, defektovka and flywheel installation
5.8. Replacement of details of consolidation of the engine
5.8.1. Replacement of laying of a cover of a head of the block of cylinders
5.8.2. Replacement of laying of a head of the block of cylinders
5.8.3. Replacement of maslosjemny caps
5.8.4. Replacement of an epiploon of a camshaft
5.8.5. Replacement of epiploons of a cranked shaft
5.8.6. Replacement of consolidation of an oil case
5.8.7. Replacement of laying of an inlet pipe
5.8.8. Replacement of laying of a final collector
5.9. Head of the block of cylinders
5.10. Removal and engine installation
5.11. Engine repair
5.12. Greasing system
5.13. Cooling system
5.14. Power supply system
5.15. Catching system паров fuels
5.16. Cистема of production of the fulfilled gases
6. Transmission
7. Running gear
8. Steering
9. Brake system
10. Electric equipment
11. Body
12. Appendices
13. Electric equipment schemes
 






8c4a8411




5-8-8-zamena-prokladki-vypusknogo-kollektora.html

5.8.8. Replacement of laying of a final collector

Between flanges of a head of the block of cylinders and a final collector the sealing laying made of the pressed asbestine leaf, reinforced by steel is established. At violation of tightness of this laying there is a break outside of the fulfilled gases, being accompanied a characteristic sharp sound (a collector «сечет»). If it is not possible to eliminate malfunction a tightening of fastening of a final collector, replace laying.
It be required to you: face heads «on 13», «on 16».
1. Unscrew three nuts of fastening of a reception pipe to a final collector and lower a reception pipe down.
2. Remove the thermoscreen of a final collector (see. «Removal and installation of thermoscreens»).
3. Unscrew eight nuts of fastening of a final collector.
4. Remove from hairpins a final collector.
5. Remove the thermoscreen...
6.... and the laying established under it.
7. Carefully clear privalochny surfaces of a head of the block and a final collector of the remains of old laying and a deposit.
8. Establish new laying and all removed details in sequence, return to removal.
9. Nuts of fastening of a final collector tighten evenly cross-wise.

Good advice
In order to avoid burning of laying and for increase of its tightness we recommend to grease before installation of laying it from both parties a thin layer of graphitic greasing.
Hairpins of a head of the block of cylinders grease with graphitic greasing.

«previous page
5.8.7. Replacement of laying of an inlet pipe
following page»